Virtual Building by CADMEC

Manage construction.
Operate buildings.
Keep data useful.

Virtual Building connects project workspaces, document management and CAFM for buildings, sites and infrastructure. Coordinate projects, organise operations and keep using plans, models and asset data across both.

As a complete platform or an additional data layer: the Intelligence Hub connects checked information to the right objects and connected systems.

No automatic renewal.

Concept illustration: buildings and a rail viaduct with digital models, asset information and connected GIS data.Project information approvedAsset documentedMaintenance assigned
Project information approvedAsset documentedMaintenance assigned
Buildings and infrastructure. Digitally connected.

Used by building owners and operators

Kantonsspital Uri
Stadt Uster
AGG · Amt für Grundstücke und Gebäude, Kanton Bern
Universitätsklinik Balgrist
GZO Spital Wetzikon
Hinderer Liegenschaften AG
Klinik Barmelweid
Klinik Schloss Mammern
Spital Bülach
Spitalzentrum Biel

AI THAT TAKES WORK OFF YOUR HANDS

AI and automation in practice.

Four examples from Virtual Building: less manual entry, faster searches and spatial views of existing plans.

EXISTING PLANS. NEW PERSPECTIVES.

Your 2D drawing.
Automatically in 3D.

Virtual Building automatically generates a 3D DWG from DXF/DWG plans. The split view shows the 2D floor plan and 3D representation side by side.

  • Use existing DXF/DWG drawings as your starting point
  • Generate the 3D DWG automatically
  • View 2D and 3D together in split view
Turn existing CAD data into a clear spatial view.
More about AI in Virtual Building
ACTUAL PRODUCT VIEWVIRTUAL BUILDING

Product view with animated explanation · German interface

Automatic processing. Traceable review.
Inside Virtual Building

Product view from the supplied CADMEC presentation. The animated website explanation is an added visual layer.

FROM THE CONSTRUCTION PROJECT TO DAILY USE

Requested. Checked. Useful where it matters.

Follow an operating manual from the project workspace to the asset. Metadata connects the file to its object, its intended use and the relevant target systems.

Project workspace

REQUIRED DOCUMENT
Operating manual

Ventilation unit L-03

Required

Intelligence Hub

Assignment & transfer

VB DMS & CAFM

At the building, room and asset.

Building ARoom 2.14Asset L-03
Available for maintenance

Your existing systems

Send checked information where it is needed.

Existing DMSExisting CAFMGIS | ArcGIS
Archive & history

Archive status and versions follow your requirements.

Additional recipients

For example, GEVER where your requirements call for it.

You define what must be delivered.

Specify the document type, object reference, delivery date and responsibility. Everyone knows what is expected.

Explanatory animation · example configuration
One item of information can serve several uses and recipients.

Destinations, assignments and data exchange are configured for your systems and requirements.

ONE PLATFORM. THROUGHOUT THE BUILDING LIFECYCLE.

One platform. Eight phases.

Choose your task. Plans, documents and building data remain useful from the first project to the next refurbishment.

↻ After handover, too: refurbishments, replaced equipment and new plan versions are reflected in the existing building data, keeping it useful for the next intervention.

03 / 08 · Build

Capture defects. Clarify tasks.

Record photos, locations and responsibilities directly on site. BIM2Field brings open issues and progress back to the project team.

  • Manage tasks and defects
  • Keep site diaries and weekly reports
  • Support variations with evidence
ResultClear tasks, documented defects and traceable progress
Explore the solution
FROM SITE TO PROJECTBIM2Field
AI illustration: a site manager photographs an uncovered services access opening with a tablet during a construction inspection.Photo recorded
Building A · Ground floor · Services area
EXAMPLE · TASK 024Access opening: fit the missing cover

Photo + location + responsible trade

RecordAssignResolveVerify
The evidence stays with the asset. Into operations.

AI-generated construction scene · illustrative workflow, not a product view

Refurbishment and replacement build on existing knowledge, with the data staying connected.

For projects in Germany, Switzerland and Austria: HOAI, SIA and LM.VM. More for owners & IT

PRICING WITH PERSPECTIVE

A clear start. A clear price ceiling.

Start with a practical task and extend your use as your needs grow.

Pricing & scope
Indicative pricing · Software licence

from

3’000CHF / EUR

per year · software licence

Maximum CHF / EUR 29,900 per year – for unlimited projects and buildings.

Your main questions.

One practical task is enough. We will show you how Virtual Building can support your team.

Arrange a personal demo
Do we need to replace our existing CAFM?

No. Virtual Building can be your CAFM solution or an additional data layer. Together we identify which existing systems should continue and which connections are useful.

Do we need a BIM model first?

No. You can start with existing plans, documents and data lists. Add models where they bring value to your task.

How does implementation begin?

We clarify your task, existing data and required functions. This creates a focused starting point with an agreed scope.

Is Microsoft 365 required?

No. Virtual Building is independent; Microsoft 365 can be connected. The separate Virtual Building 365 offering is based on Microsoft 365.

What does metadata control?

It describes the object reference, document type, version and intended use. Your rules assign documents to buildings, rooms or assets, prepare them for operations and, where required, transfer them to other systems such as GEVER. Archive status and operational relevance remain distinguishable.

PricingRequest a demo